R.E. Mason

Scope

Timeline

6 months (Complex integration project)

Completed March 2026

441 data cables across 3 floors

  • 64 Cat 6 cables for wireless access points

  • 347 voice/data cables

  • 54 future A/V cables

22 access control card readers

  • Bluetooth-enabled mobile access

  • Electric strikes and mag locks

  • Door position monitoring

20 security cameras with NVR

  • Indoor/outdoor PTZ cameras

  • 16-channel recording system

  • Local and cloud storage

Sound masking system

  • 16 ceiling speakers installed

  • Multi-zone processors

  • Uniform coverage throughout

Partnerships

R.E. Mason - General contractor partnership

Results

✓ All systems integrated on unified platform

✓ $11,400 credit for reused materials

✓ Value-engineered to meet budget

The Final Installation