Converge completes Hilton Garden Inn project (Pictures attached)

http://www.convergect.com/wp-content/uploads/2010/02/CIMG0397.jpghttp://www.convergect.com/wp-content/uploads/2010/02/CIMG0397.jpghttp://www.convergect.com/wp-content/uploads/2010/02/CIMG0397.jpghttp://www.convergect.com/wp-content/uploads/2010/02/CIMG0397.jpghttp://www.convergect.com/wp-content/uploads/2010/02/CIMG0397.jpghttp://www.convergect.com/wp-content/uploads/2010/02/CIMG0397.jpgConverge completes Hilton Garden Inn project (Pictures attached)

Converge has recently completed the new Hilton Garden Inn Hotel being built in Concord, NC.  Converge install 6 floors of Co-Ax cabling, Voice Cabling, and Data cabling.

Wastequip chooses Converge for cabling of new facility

Wastequip is moving to a new 8,000 sq ft facility in the SouthPark area of Charlotte, NC.  Through a strong relationship with Choate Construction Company and Trinity Partners, Converge was introduced to Wastequip and began discussions regarding their cabling needs. Converge was contracted to install 90 Category 6 cable drops and extending the T-1 lines… READ MORE